Kennedy's Drive Sewer Pump Station & Wet Weather Detention Storage

Kennedy's Drive Sewer Pump Station & Wet Weather Detention Storage

Ballarat, Vic

Project Duration

December 2016 to December 2017

Client

Central Highlands Water

Project Value

$ 4.4m

JAYDO was awarded the Kennedy’s Drive Sewer Pump Station (SPS) and Wet Weather Detention (WWD) Storage project by Central Highlands Water in December 2016. The scope of works included:

  • Construction of a 10m deep, 4m internal diameter cast in-situ epoxy coated concrete wet well
  • Construction of new precast concrete valve pit & flowmeter pit
  • Supply & install mechanical equipment including 2x submersible pumps, DI discharge & scour pipework, valves, pipe supports and fittings
  • Installation of Wet Weather Detention Storage including 16x 175kL GRP tanks, riser, interconnecting pipework and precast concrete manholes
  • Installation of 70m of DN600 GRP gravity main and ERS pipework in road reserve
  • Installation of 90m of DN400 PN16 PE Rising Main & DICL pipework in road reserve
  • Electrical works including design and construct of a new main switch board, telemetry and ancillary equipment;
  • Design and construct retaining wall
  • Construction of the car park, fencing and remaining civil items

key challenges

  • Load restrictions atop the 175kl tanks meant only a skid steer could be used to backfill the 16 tanks creating a time-consuming process
  • Poor ground conditions required extra support and trench protection systems to ensure safety of onsite personnel
  • Weatherproofing site prior to forecasted rainfall events

Key innovations

The crew experienced difficulty preventing the 600mm diameter foam block-outs from floating during pouring of the manhole concrete bases. An engineered solution involved a fabricated steel support frame to support the bottom precast ring and provide added weight to prevent floatation.