Dandenong Creek Litter Trap Installation
Dandenong Creek Litter Trap Installation
Keysborough, Vic
Project Duration
Client
Project Value
The project involved installation of a litter trap within a 1m deep, concrete-lined creek to improve water quality and capture debris. Works also included construction of a crushed rock hardstand with turning circle and a concrete maintenance access track to support safe access and ongoing maintenance. At the existing culvert, rock beaching was installed for erosion protection and stability, along with guard rail to improve site safety and protect maintenance personnel.
key challenges
Managing the unexpected discovery of PFAS contaminated ground conditions, correctly disposing of the contaminated soil using an external subcontractor
key innovations
Use of a floating Bandalong Litter Trap, provided by Melbourne Water, placed in a strategic location for litter minimisation