Urban Development

Delivering water and drainage infrastructure projects for various authorities, local Governments and the land development industry. 

Jaydo’s Urban Development team delivers drainage, sewer, water, pump stations, water storage and wetland projects, with the built assets ultimately handed over to the asset owners that include Metropolitan or Regional water authorities, local or state Governments, and private asset owners. 

Key Projects

Lewis Street Main Drain

Melbourne Water, Mitchell Shire Corporation, Colliers Engineering, Melbourne Land Corporation

____

Construction of a total of 2,414m of large diameter drainage pipeline to future proof the Beveridge community providing improved drainage and road surfaces.

Parkwood Terrace Reserve Desilting Works

Wyndham City Council

____

Desilting of Parkwood Terrace Reserve Wetland to restore it to it’s original water-holding capacity, enhance stormwater treatment performance, and support it’s overall ecological health.

Donnybrae Estate Stage 200 - Rail Crossing

Dennis Family Corp, Melbourne Water

____

Comprehensive stormwater project involving earthworks, drainage, microtunnelling, and 260 m of DN1650/DN1500 RCP pipelines. Works included boring under the Melbourne–Sydney rail line near sensitive environmental and cultural sites.

Dights Falls Embankment Reinstatement

Melbourne Water

____

Rectification and reinforcement of the Dights Falls embankment including the strategic placement of 2,000 tonnes of rock beaching material delivered adjacent to a shared user path.