Kallista Sewer Pump Station
Kallista Sewer Pump Station
Kallista, Vic
Project Duration >
June 2019 to October 2020
Client >
Yarra Valley Water
Project Value >
$ 1.4m
JAYDO was awarded the contract to build the new Kallista Sewer Pump Station located on a greenfield site in Kallista, Victoria, to be connected to the new rising mains pipeline. Works included all civil, building, mechanical and electrical works.
- All civils works to allow construction of building slab, tank and pipework
- Construction of the sewer pump station building
- Supply and installation of 2x 110kw progressive cavity pumps, 2.2kw inline macerators and
ventilation fans - Complete fitout of the pump station and related pipework, support system and associated fittings
- Detailed electrical design of the complete power and control system
- All electrical works including supply and installation of new 630Amps group metering panel, 320Amps combined main switchboard / motor control center and external 132KW IP55 ABB VSD’s and 70Amps ABB Active front end harmonic filter
- Complete system testing, commissioning and handover
key challenges
- A prolonged commissioning process due to delays by others
- Delays to the mains power connection due to delays by the power distributor
- Delivered during the COVID-19 pandemic
Project Outcomes
The Kallista Sewer Pump Station was successfully commissioned initially using power from a diesel generator, later using the mains power.
Client feedback
Yarra Valley Water was pleased with the quality of works completed by JAYDO. The collaborative approach by JAYDO and Yarra Valley Water enabled some of the challenges relating to design documentation and value add to be resolved in a timely manner and to Yarra Valley Water’s satisfaction.